Special Maintenance Work for Construction of U-Turn at Saeed Bypass at Km 232 to 233 on N-5, U-Turn at Hyderabad Bypass at Km 163 164 on N-5, Highway Safety Work from Amari to Sehwan Km 100+000 to 135+000 N-55, Highway Safety Work 212~149 N-5 SBC, Highway Safety Work 45+000 ~ 85+000 N-55 NBC SBC, Replacement of Expansion Joint at Karachi Wah, Periodic Maintenance Work Km 205+680 to 208+000 N-5

0

Leave a Reply

Your email address will not be published. Required fields are marked *